´ºÓêÖ±²¥app

´ºÓêÖ±²¥app

"Experiments Begin on Ultra-Low Latency Network Campus"

Publish: November 16, 2023
Public Relations Office

2023/11/16

´ºÓêÖ±²¥app

Furukawa Electric Co., Ltd.

´ºÓêÖ±²¥app (President: Kohei Itoh) and Furukawa Electric Co., Ltd. (President: Hideya Moridaira) have installed hollow-core fiber optic cables at the ´ºÓêÖ±²¥app Future Photonic Network Open Lab on ´ºÓêÖ±²¥app's Shin-Kawasaki Town Campus (K2) and have begun experiments on an ultra-low latency network campus connecting multiple buildings. This was conducted as part of the "Research and Development of Advanced Optical Transmission Technology for a Green Society" project by the Ministry of Internal Affairs and Communications. This marks the completion of the world's first facility where engineers from both inside and outside ´ºÓêÖ±²¥app can experiment with hollow-core fiber in a near-practical environment.

Please see below for the full press release.

Press Release (PDF)